• plinky [he/him]@hexbear.net
    link
    fedilink
    English
    arrow-up
    26
    ·
    edit-2
    9 months ago

    It’s still would be like 1-2 km, if they aim at 10g. And they still need to find another 20 machs from rocket booster.

    Doing full railgun with small rockets is more poggers (without humans obv ) shrug-outta-hecks

    • Coolkidbozzy [he/him]@hexbear.net
      link
      fedilink
      English
      arrow-up
      27
      ·
      9 months ago

      Tests will be carried out at 1.2 mile long low-vacuum track high-speed maglev test facility in Datong, generally used when researching magnetic levitation train technology

      Within coming years, the Datong test facility will be extended to 37.2 miles long, to achieve a maximum operating speed of a staggering 5,000km/h.

      biiiiig track incoming

      from daily mail