The President has captured over 96% of the vote with most of the ballots in and reported.

  • doctorcrimson@lemmy.today
    link
    fedilink
    arrow-up
    2
    ·
    5 months ago

    Cut costs and increase results like those politicians who made concrete and rebar standard materials for bridges? The bridges that are now in disrepair all over the USA due to the short lifespan of the product? Nah, screw that.

    If they’ve got a law degree, sure. They’re an artist? Absolutely. Engineers? Fuck Yeah! They’ve got degrees in statistics and finance? BANGER. They’re a “Businessman?” NEED NOT APPLY.

    • DragonTypeWyvern@literature.cafe
      link
      fedilink
      arrow-up
      1
      arrow-down
      1
      ·
      edit-2
      5 months ago

      I don’t think it’s the fault of the designer or original leadership that the people that followed them didn’t actually do what they were supposed to…

      You could build a bridge that will last fifty years with no maintenance, or 100 years with proper maintenance, is it a bad bridge because in seventy years with no maintenance it’s falling apart?

      Or is it just that your successors didn’t do their jobs, aka, get results?

      • doctorcrimson@lemmy.today
        link
        fedilink
        arrow-up
        1
        ·
        5 months ago

        Concrete and Rebar fails in less than 20 years because the cheapest most widely available rebar is iron, which rusts rapidly once the surface of the concrete cracks.

        • DragonTypeWyvern@literature.cafe
          link
          fedilink
          arrow-up
          1
          arrow-down
          1
          ·
          5 months ago

          Idk who’s telling you this but they’re lying, probably because they’re skimming the maintenance budget and then gaslighting you about why it’s falling apart.

          • doctorcrimson@lemmy.today
            link
            fedilink
            arrow-up
            1
            ·
            5 months ago

            The only way to maintain those structures are to rebuild them in segments, which is admittedly easy to do but in turn raises the cost over time.

            • DragonTypeWyvern@literature.cafe
              link
              fedilink
              arrow-up
              1
              arrow-down
              1
              ·
              5 months ago

              You mean like something they would create a maintenance budget for and say “do this at these periods and it will be cost effective?”