• Funderpants @lemmy.ca
    link
    fedilink
    arrow-up
    50
    ·
    10 months ago

    This transition had been known to be nessecary for decades, and known to Alberta that Trudeau would act on it since Trudeau won government in 2015. Alberta squandered its time and money and wants us to beleive its the victim now. Poor persecuted Alberta.

    • dgmib@lemmy.world
      link
      fedilink
      arrow-up
      10
      ·
      edit-2
      10 months ago

      This is the same premier that declared a moratorium on new grid scale solar and wind farms. Alberta has some of the most optimal conditions in Canada for solar power and we can’t build it, because….

    • nyan@lemmy.cafe
      link
      fedilink
      English
      arrow-up
      5
      ·
      edit-2
      10 months ago

      While the CANDU heavy-water plants that power half of Ontario have proven themselves safe, they’re slow and expensive to build (and not cheap to operate, either). If Alberta started building one right now, it would be years before they would see any benefit. Hard to make that work in the current political climate.

      Other plant types are, by my understanding, less safe, less proven, or continually five years in the future.

      • MisterD@lemmy.ca
        link
        fedilink
        arrow-up
        6
        ·
        10 months ago

        Politicians are punished if proactive and praised (and re-elected) if reactive.

        Look at the Carbon tax now. When the equator is a no-mans-land and tornadoes are the norm, Carbon tax will seem like a “why didn’t you do it back then” idea.

      • Peppycito@sh.itjust.works
        link
        fedilink
        arrow-up
        1
        ·
        10 months ago

        We traded nuclear science R&D for a construction worker jobs program a long time ago. Way easier for politicians to sell constant refurbishment of our grandparents reactors than some smarty-pants physicists looking at a computer.

        • Sir_Osis_of_Liver@kbin.social
          link
          fedilink
          arrow-up
          1
          ·
          10 months ago

          That’s not true. The Westinghouse AP1000 got type approval in 2011. The EPR got type approval in the early 2000s. Both are GEN III+ reactors, which are semi-modular and have reduced length and number of pipe-runs and number of pumps, valves and so on. They’ve got 60 year design lives compared to 30 years for the typical Gen II design. It didn’t stop them from being more expensive to build than the prior reactor types.

          The EPR2 is currently undergoing certification. It would be a brave utility to roll the dice on a new, untested version of the EPR after the fiascos at Flamanville, Olkiluoto, Taishan and Hinckley.

          SMRs to date have been one failure after another. NuScale just cancelled the Idaho project in spite of receiving $4B in government subsidies. X-Energy cancelled plans to go public and laid off 100 staff. Oklo’s Aurora reactor license application was so poor that it was rejected almost immediately by the NRC. Rolls Royce has announced that their £500B SMR program will run out of cash by the end of the year, and so on.

          New cost estimates from TerraPower and XEnergy as part of the Department of Energy’s Advanced Reactor Deployment Program are likely to reveal substantially higher cost estimates for the deployment of those new reactor technologies. This would confirm other independent studies on SMR economics.

            • Sir_Osis_of_Liver@kbin.social
              link
              fedilink
              arrow-up
              1
              ·
              10 months ago

              Four AP1000s have been built in China. The Chinese also have an agreement with Westinghouse to further develop the design, so more are under construction, but those are heavily modified Chinese variants.

              Four AP1000s were under construction in the US, two at the Vogtle generating station in Georgia, and two at the V.C Summer plant in South Carolina. The V.C. Summer reactors were cancelled during construction when the initial estimate was revised from $9B to $23B. The Unit 3 at Vogtle has finally completed commissioning and is online, and unit 4 should be completed this year. Costs have exploded from $14B estimate at the beginning of construction to the vicinity of $35B.

              There are another 5 reactors planned for Turkey and Poland. I’m not sure where they’re at currently.

              For the EPR, the first unit to start construction was Olkiluoto-3 in Finland in 2005. It was supposed to complete commissioning in 2010, but finally was completed in 2022 and entered service in 2023. Costs went from €3.3B to €11B

              Taishan 1 & 2 started construction in 2009 and were supposed to be completed in 2013. Taishan-1 entered service in 2018, and Taishan-2 in 2019. Though the third EPR project to start construction, these were the first in service. The final $7.5B cost was roughly double the estimate. Since then, unit 1 was offline for a year due to issues with the fueling. There have been some other reliability issues, some causing brief downtime.

              Flamanville-3 started construction in 2007, was supposed to be commissioned in 2012, but is currently projected to be in service late this year. Costs bloated from €3B to a projected €20B at completion.

              Hinkley Point C started construction of two EPRs in 2017, though a lot of site prep work started well prior to that. It was supposed to be online in 2023. Currently they’re projecting 2028. Costs have gone from the initial £16B to a projected £33B.

              The average age of a French reactor is 37 years. They get an initial license for thirty years then apply for ten year extensions. They have 56 operational reactors now, and have an ongoing ‘grand carénage’ refurbishment for mostly the larger units. The estimate for that was in the vicinity of €55B, though has shifted some what. The smaller, older units are being taken out of service.

              More often than not, older reactors in the US are taken out of service rather than refurbished due to the economics. Globally there are 407-413 (definitions vary) operational reactors, down from 438 at the peak in 2002.

    • Sir_Osis_of_Liver@kbin.social
      link
      fedilink
      arrow-up
      3
      ·
      edit-2
      10 months ago

      It’s been reported alternatively as “undergoing scheduled maintenance”, “undergoing unscheduled maintenance”, or “system failure due to cold”. Scheduled maintenance is BS, no one schedules that for peak seasonal demand times. Who knows about the other two.

      With the market setup in Alberta, those plants going down caused a spike in electricity spot prices. Generators can make a windfall profit in tight supply times. Residences without contracts will see their price go to something like 32¢/kWh. With the way the Alberta market rules are set up now, there are no penalties for generators voluntarily shutting down in order to bump prices. It’s basically the same market manipulation that Enron was pulling twenty years ago.

      Alberta has the highest provincial electricity costs, on average 25¢/kWh, Saskatchewan is second at 20¢/kWh, with the others trailing off from there. Manitoba is something like 10.8¢/kWh and Quebec is cheapest at 8¢/kWh. (typical costs for first 1000kWh including distribution and other fees)

  • AutoTL;DR@lemmings.worldB
    link
    fedilink
    English
    arrow-up
    1
    ·
    10 months ago

    This is the best summary I could come up with:


    In white text on black boards, messages that were both visually and rhetorically stark flanked Premier Danielle Smith last fall as she launched a big advertising campaign against Ottawa’s clean electricity regulations.

    Cabinet ministers played up the fact wind and solar power didn’t come through in last weekend’s deep freeze, and when Smith returns from vacation next week she might take some more whacks at that UCP whipping post.

    Inflammatory rhetoric on either the pro or con side of net zero can fuel headlines and stoke political bases, but it won’t power Alberta’s energy-hungry homes and cities, now or in the future.

    The province had already begun work on a potential redesign of its regulated private market system when the cold snap rattled its grid more than similarly shivering Saskatchewan and British Columbia, which could both export some extra juice to Alberta.

    He noted that the direct risk of this happening will be greatly diminished later this year when several massive gas plants come online, largely to replace the soon-to-be-eliminated (and much dirtier) coal-powered generators.

    That could come with help from the new natural gas plants, but also the wind turbines and solar panels that produce in much greater abundance during longer days and gustier warm months.


    The original article contains 1,112 words, the summary contains 206 words. Saved 81%. I’m a bot and I’m open source!