• a_statistician@programming.dev
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    1
    ·
    10 months ago

    Columbia station load follows within a certain range set by nearby hydro. It can be done. The economics aren’t even that bad, as fuel is one of the cheaper inputs to the reactor.