• 0 Posts
  • 7 Comments
Joined 1 year ago
cake
Cake day: June 21st, 2023

help-circle


  • Except those reactors are off 30-50% of the time due to shoddy construction

    For French nuclear power, the lowest load factor ever recorded is 54% in 2022. The cause is the number of maintenance operations postponed because of COVID, plus a corrosion problem detected on several reactors of the same generation, which have since been repaired.

    • This is an extremely unlikely combination of circumstances, on the one hand
    • On the other hand, it wouldn’t have had any consequences if we’d had more redundancy, and hadn’t suddenly stopped building reactors for 25 years.
    • Despite this, nuclear power still has a load factor 2x higher than French wind or solar power.

    The rest of the time, the load factor of French nuclear power hovers around 70-75%, and that’s not due to bad design, it’s a strategy. I’ll let you read this link to learn more.

    €1.5/W in 2023 money is pure fiction

    Of course it does. But the fact is that french nuclear power has paid for itself dozens of times over. It’s factual, it’s historical.

    and overnight costs with free capital aren’t real costs once you adjust for inflation and stop cherry picking the first reactors before negative learning rates kicked in.

    Go argue with the Cour des Comptes, not me


  • Chernobyl and Fukushima. These two events, which between them account for a few thousand deaths at most (compared with the tens of thousands of deaths caused by coal in Europe alone, for example), triggered a panic fear of nuclear power.

    For decades, the nuclear industry has been abandoned and sabotaged, with projects such as Phénix, Superphénix and Astrid in France, and virtually all new reactor projects, cancelled due to anti-nuclear opposition.

    Competent nuclear engineers and technicians have retired without being able to pass on their know-how, and cutting-edge nuclear-related industries have disappeared or been converted.

    We can also thank the Germans for sabotaging the EPR. We started the project together, they forced us to add a lot of totally unjustified redundancies and safety features that made the prototype very complex and therefore costly to build, and then they slammed the door on us.


  • France was able to output 2 reactors per year at 1,5 billion of euros per 1000MW for more than 2 decades during the 70’s to 90’s. The whole French nuclear industry has cost around 130-150 billions between 1960 and 2010, including researches, build and maintenance of France’s whole nuclear fleet.

    A 1000MW reactor, at current French electricity price and for a 80% capacity factor, generates 1,4 billion of euros worth of electricity per year, for a minimum of 60 years.

    Nuclear is not costly, and can absolutely compete by itself, if you don’t sabotage it and plan it right.



  • J’ai fait un aller-retour entre Orléans et Toulouse, ça s’est pas trop mal passé.

    Le petit couac, c’est qu’à l’aller, y a une voiture qui est indiquée sur ton billet pour aller y mettre ton vélo, sauf que je suis monté dedans et rien.

    Finalement un agent de la SCNF est arrivé en courant et m’a indiqué la voiture qui contenait réellement les portes-vélos, donc j’y suis allé en vitesse, et le même mec m’a dit que je pouvais rester sur les places assises à côté du vélo parce que personne n’avait pris de billet à cet endroit.

    Pas de problème pour le retour.