So that’s why a 2 systems were getting crappy speeds. Yes, 2. It had been used only to split a single drop from another switch between two systems.

New drop, happy clients.

Some stuff here is museum material.

  • Great Blue Heron@lemmy.ca
    link
    fedilink
    English
    arrow-up
    2
    ·
    2 months ago

    It’s a 200’ cable and the buildings each have their own connection to the power company. I suspect that the earth potential of the two buildings is quite different - I just have not figured out a way to measure it yet and not sure if there’s anything I can do to fix it even if I do confirm it.